Thames Tideway

Tideway is one of the largest and most ambitious civil engineering projects in Europe. It aims to construct a 25km tunnel under London’s river that will prevent the tens of millions of tonnes of pollution that currently pollute the River Thames every year.

Overview

This necessary expansion of London’s sewer network is due for completion in 2024, and is being carried out across 24 construction sites in London.

Tideway is one of the largest and most ambitious civil engineering projects in Europe. It aims to construct a 25km tunnel under London’s river that will prevent the tens of millions of tonnes of pollution that currently pollute the River Thames every year.

The construction in the West region will be delivered by a joint venture of BAM Nuttall Ltd, Morgan Sindall Plc and Balfour Beatty Group Ltd (BMB). This contract is known as Tideway West with work taking from Acton to Fulham.

The construction in the Central region will be delivered by a joint venture of Ferrovial Agroman UK Ltd and Laing O’Rourke Construction (FLO). This contract is known as Tideway Central with work taking place from Fulham to Blackfriars.

Client: BAM Nuttall, Morgan Sindall, Balfour Beatty Group, Ferrovial Agroman UK and Laing O'Rourke Construction

Date: Dec 2024

Sector: Civil Engineering

Value: £4.2 Billion

Details and Achievements

Vision Survey was chosen to manage the permit to dig particulars for the West and Central Section of the projects, based out of the main Kirtling Street site where the two Tunnel Boring Machines were housed at the time of writing.

 

Services used

No data was found

Share Project

Discover similar projects

Case Study

Hinkley Point

Case Study

Olympic Park

Case Study

London Gatwick Airport

Case Study

Crossrail, Farringdon Station

Case Study

Thames Tideway

Case Study

High Speed 2 (HS2)

Case Study

Silvertown: Utility Survey