High Speed 2 (HS2)

High Speed Two (HS2) Phase One will consist of around 140 miles of rail track and connect Euston Station, London to Birmingham.

Overview

We have worked across a number of the HS2 JVs since 2020 offering construction support. The work we have carried our ranges from Ground Penetrating Radar for service clearance purpose to setting out of piling, along with more complex site engineering on the Thame Valley Viaduct. The first stage of the project will cost approximately £19.3 billion and is due to start operations in 2026.

Fusion JV (an amalgamation of the three construction companies, Morgan Sindall, BAM Nuttall and Ferrovial Agroman) were awarded Area Central of HS2’s enabling works contracts.

Client: Fusion, EKFB, FCCS & SB3 Joint Ventures

Date: July 2020

Sector: Civil Engineering

Value: -

Details and Achievements

They are responsible for delivering preparatory ground works to some 100km of the phase 1 route before the commencement of major civil engineering activities.

Vision Survey has been chosen by Fusion JV to assist with the enabling works by delivering the following essential services.

Services used

No data was found

Share Project

Discover similar projects

Case Study

Hinkley Point

Case Study

Olympic Park

Case Study

London Gatwick Airport

Case Study

Crossrail, Farringdon Station

Case Study

Thames Tideway

Case Study

High Speed 2 (HS2)

Case Study

Silvertown: Utility Survey